Parking-Based Planning
We review where vehicles park, how long they stay, and how many spaces need charging now and later.
We plan Level 2 EV charging around your parking layout, electrical capacity, and the people who will use it, from employees and customers to tenants and fleets. Charging can be coordinated with solar and battery storage as one system.
Level 2 Charging
Load Planning
Solar Coordination
Managed From Start to Finish
Commercial charging has to fit the parking lot, the electrical service, and the way vehicles use the site. We plan those details before recommending chargers.
We review where vehicles park, how long they stay, and how many spaces need charging now and later.
We evaluate electrical capacity and plan charging loads so the system fits the property's service.
We plan around LADWP or SCE requirements, permits, inspections, and interconnection steps.
A local team with a C-10 Electrical Contractor License handles your project from design to activation.
Commercial solar for A&I in Van Nuys
Swipe to compare →
| Option | Workplace Charging | Customer & Tenant Charging | Fleet Charging |
|---|---|---|---|
| Who It Serves | Employees who park during the workday | Visitors, shoppers, and residents | Company vehicles that return to the site |
| Typical Use | Longer charging during working hours | Charging while people visit, shop, or stay | Regular charging on a set schedule |
| What We Review | Number of EV drivers and the parking layout | Parking turnover, access, and which spaces to equip | Vehicle count, routes, and charging windows |
| Planning Focus | Room to add spaces as demand grows | Convenient locations and clear access | Enough capacity for the whole fleet schedule |
| Pairs Well With | Rooftop solar and carports | Solar carports for covered charging | Battery storage and load planning |
The right charging plan isn't simply the most chargers that fit. We review who will charge, how long vehicles stay, electrical capacity, and room to grow. Then we recommend a layout and number of Level 2 chargers that make practical sense.
We review your parking layout, electrical service, utility usage, and how vehicles use the site.
We plan charger locations, circuits, and charging loads around your capacity and future spaces.
We prepare the plans and coordinate permits, inspections, and any utility steps the project requires.
Our licensed crew installs the chargers and electrical equipment on a schedule coordinated with your team.
We coordinate the required inspections and test each charger before handoff.
We activate the chargers and show your team how they operate.
EV charging adds new electrical load. We can review solar, battery storage, and carports alongside your charging plan, so each part supports the way the property uses power.
Produce on-site power to offset part of the charging and building load.
Store solar energy and support peak demand when charging adds load.
Cover charging spaces with solar and shade for the vehicles below.
Plan circuits and capacity so charging fits the property's electrical service.
Commercial Results
A&I's Van Nuys warehouse and offices run on rooftop solar that Soloro designed and installed without interrupting daily operations.
Van Nuys Case Study A&I Inc. · Rooftop Solar
“Looking back, if I were to go to solar again, I would go directly to Soloro.”
Commercial EV Charging FAQ
Commercial charging depends on who will charge, how long vehicles stay, and what the electrical service can support. These answers cover what property owners and managers ask most before an assessment.
We plan and install Level 2 charging for workplaces, retail properties, multifamily communities, and fleets. The right setup depends on who will charge and how long vehicles stay parked.
Enough for the drivers you have today, with electrical capacity planned for more. The right number depends on how many drivers will charge, how long vehicles stay, and how quickly demand may grow.
It may, or it may need an upgrade, depending on the existing service and the building's other loads. We review electrical capacity and plan charging loads before recommending a layout.
Yes. Solar can offset part of the power used for charging, and battery storage can help support peak demand. We can review them as one plan.
Yes. A solar carport can be laid out with charger locations and electrical capacity planned in, so vehicles charge in covered spaces.
Yes. Commercial charger installations require permits and inspections, and some projects also involve the utility. The process depends on the property location and project scope.
Yes. Soloro serves businesses across Los Angeles and Southern California in both LADWP and SCE territory.
Helpful details include the property address, parking layout, electrical plans if available, recent utility usage, and how many drivers or fleet vehicles may need charging.
EV Charging Costs
The number of drivers, how long vehicles park, and when they charge are the starting point for charger count and cost.
Charger count, cable runs, electrical upgrades, and permitting all shape the final price. Your proposal should make those costs clear.
Review purchase and financing options side by side, along with incentives that may apply to your project.
Contact Us
Our team is here to help. Reach out today and let Soloro help you plan the right energy system for your business.
Whether you are exploring solar for one building or several, our team is ready to answer your questions and help you find a clear starting point.